Shutdown Checklist
The following checklist is a quick reference to ensure equipment shutdown tasks are completed in the required sequence. Detailed instructions are located in Shutdown the ProtoMAX.
Position the nozzle for shutdown | |
Remove the abrasive feed tube from the nozzle | |
Run test nozzle to clear the nozzle | |
Close MAKE | |
Turn OFF the laptop | |
Turn OFF the ProtoMAX | |
Clean the machine | |
Turn OFF the water supply | |
Turn OFF the breaker power switch, if needed |