Shutdown Checklist
The following checklist is a quick reference to ensure equipment shutdown tasks are completed in the required sequence. Detailed instructions are located in Shutdown the ProtoMAX.
| Position the nozzle for shutdown | |
| Remove the abrasive feed tube from the nozzle | |
| Run test nozzle to clear the nozzle | |
| Close MAKE | |
| Turn OFF the laptop | |
| Turn OFF the ProtoMAX | |
| Clean the machine | |
| Turn OFF the water supply | |
| Turn OFF the breaker power switch, if needed |